Sunday, November 20, 2011

Exterior walls almost done

Exterior walls are basically done. Window locations finalized and will be cut out shortly.

Once the carport storage room is set, it'll be time for the pour. First, there'll be rebar placed vertically and horizontally through the entire grid. Then, a nice wet concrete mix will be poured through all the cavities.

View of the master:



View of the kitchen:



View of the master and master bath:





Another shot of the master: